Tag: #VendorManagement

  • Start With the Baseline: What to Gather Before You Decide Anything

    Every program decision I have seen go wrong had the same root cause: someone made it before they knew where they stood.

    Companies pick a technology, issue an RFP, or sign with a provider based on a general sense of their spend. Then the real numbers surface, and the design no longer fits. I have seen many implementations over the years where the procurement leader was convinced they only had 10 suppliers across the country.  A month later, when we were getting ready to communicate to the business and the supplier community that the program was being implemented, we uncovered 15 more suppliers that managers have been getting talent from.  Leadership was shocked.

    A baseline fixes that. It is not a big project. For a company with $10-50 million in contingent spend, it usually takes a few weeks of part-time effort, and it makes every later decision cheaper and better.

    What a baseline answers

    Four questions:

    1. How much are we spending, and on what?
    2. Who are we buying from?
    3. What are we paying?
    4. What have we agreed to?

    Everything else, including model, technology and governance, builds on those answers.

    By the numbers: why it pays to know your picture

    In the same People2.0 survey of larger enterprises:

    • 75% said contractors, freelancers and temporary workers make up at least 11% of their workforce, and 43% said more than 20%.
    • 53% ranked controlling costs while keeping workforce agility as their biggest contingent workforce challenge.

    Source: People2.0 research, reported by Staffing Industry Analysts, Sept. 25, 2026.

    What to gather

    Spend. Pull 12 months of contingent labor spend from accounts payable and finance. Break it down by supplier, department, location and worker type (staff augmentation, project-based, statement of work, independent contractors). Do not expect it to be clean. Contingent spend often sits across several accounts and cost centers, and some of it is coded as services or consulting.

    Suppliers. List every supplier you paid in the period. For each, note total spend, number of workers, who manages the relationship, and how long you have worked together. Most companies find a long tail: many suppliers with small spend, a few with most of it.

    Rates. For your highest-volume roles, compare what you pay across suppliers and departments. Look at bill rates and markups. Where the same role carries different rates, find out why. Sometimes there is a good reason, such as location or skill level. Often there is not.

    Contracts. Collect every agreement with every supplier. Note the term, markup or fee structure, conversion fees, insurance and indemnification requirements, and anything unusual. Also note which suppliers have no current agreement.

    Workers. Where you can, find out how many contingent workers you have at any point in time, how long they have been with you, and who they report to. Long-tenured contingent workers are both a cost and a compliance question.

    Process. Write down how a hiring manager actually engages a contingent worker today: who approves, which supplier they call, how onboarding works, how invoices get approved. Describe what really happens, not what the policy says.

    Baseline checklist

    • ☐ 12 months of contingent spend, by supplier, department and worker type
    • ☐ Complete supplier list with spend and worker counts
    • ☐ Rates for top 10-15 roles, compared across suppliers
    • ☐ Copies of all supplier agreements, with gaps noted
    • ☐ Current headcount and tenure of contingent workers
    • ☐ The real engagement process, from request to invoice
    • ☐ Names of everyone who manages a supplier relationship
    • ☐ Open compliance questions (classification, tenure, co-employment)

    Who should be involved

    You need a small group: someone from finance or accounts payable who can pull the data, someone from procurement, contracts or HR who knows the suppliers, and a sponsor with the authority to ask hiring managers for information. A baseline led by one person with no sponsor stalls at the first department that does not respond.

    What to do with what you find

    Three outputs matter:

    • A one-page summary of total spend, supplier count, rate variation and contract gaps. This is what leadership needs to approve the next step.
    • A list of quick wins, such as consolidating suppliers on the long tail, fixing missing agreements or correcting obvious rate outliers.
    • A set of requirements for the model and technology decisions that follow.

    The baseline also gives you a starting point for measuring results. If you do not record where you started, you cannot show what changed.

    Common mistakes

    • Waiting for perfect data. It will not be perfect. Aim for good enough to see patterns.
    • Skipping the process review. Spend data shows what happened, not why.
    • Treating it as a one-time project. Keep the baseline updated, because it becomes your reporting foundation.

    Next step

    Once you know where you stand, you can evaluate technology with real requirements instead of a vendor’s feature list. That is Article 4.

    If you would like help running a baseline, I am happy to talk about how I can help. Email me at becky@ennisbader.com to schedule a 20 minute discussion.

  • Do You Need a Contingent Workforce Program Yet?

    If your company spends between $10 and $50 million a year on contingent labor, you probably have more of a program than you realize and less control than you think.

    I have spent 30 years building and running these programs. The companies that struggle most are rarely the ones with no program at all. They are the ones where the program grew by accident: a few staffing vendors added over the years, hiring managers who each negotiate their own rates, and nobody who owns the whole picture. For example, I had a customer once who thought they spent $11 million a year on contingent workers and that they had 4 suppliers that they were utilizing. What they didn’t realize was that they had 3 other vendors billing an additional $5 million annually in 1 department and the workers have all been there long enough to be converted to full time employees because no one was managing to the contracts with the suppliers.

    Here is how to tell whether that describes you.

    Why this spend range is different

    Below about $10 million, spreadsheets and a good relationship with a couple of suppliers can carry you. Above $50 million, most companies already have a formal program because the cost of not having one is too visible.

    The middle is where problems hide. The spend is large enough that small inefficiencies add up to real money. But it is small enough that no one is hired to manage it, so it falls to procurement, HR, finance or the hiring managers themselves, all of whom have other jobs.

    By the numbers: vendor sprawl and visibility

    A survey of 700 senior decision-makers at enterprises with more than 500 employees and over $100 million in revenue, across six countries including the US and Canada, found:

    • 46% manage six or more outside vendors for their contingent workforce, and 17% manage more than 10.
    • 28% named a lack of visibility into workforce data and reporting as a challenge.

    Source: People2.0 research, reported by Staffing Industry Analysts, Sept. 25, 2026.

    This was right in line with what I saw from the customer in my earlier example.

    Here are seven warning signs that you might need a program to manage your contingent labor.

    1. You cannot say, quickly, how much you spend on contingent labor. If the answer takes a week and three people, you do not have visibility.
    2. You work with many staffing suppliers and nobody can say why. Vendor sprawl usually means each manager picked their own.
    3. The same role is billed at different rates. Check two departments using the same job title. Rate variation without a reason is lost margin.
    4. Contracts are missing, outdated or inconsistent. Terms, markups and conversion fees differ by supplier, and some workers are engaged with no agreement at all.
    5. Nobody owns the program. If you ask who is accountable for contingent workforce cost, quality and compliance and get several answers, the real answer is no one.
    6. Invoices are a recurring headache. Disputes, corrections and late approvals are rarely just an accounting issue. They point to unclear rates, weak onboarding or poor supplier communication.
    7. You worry about compliance but cannot prove you are covered. Worker classification, tenure limits and co-employment risk all get harder to manage without a central view.

    One or two of these is normal. Four or more means you are paying for the lack of a program, even though you never chose to.

    What a program actually is

    When I say “program” to a company at this size, people picture a large outsourced managed service provider and a long, expensive rollout. That is one version, and it is often more than a $10-50 million company needs.

    At its core, a program is just four things:

    • Visibility: one view of who is working for you, through which supplier, at what rate
    • Standards: consistent rates, contracts and onboarding
    • Ownership: a named person accountable for results
    • Measurement: a short list of metrics reviewed regularly

    How you deliver those four things, with an outside provider, with technology, or mostly with your own team, is a separate decision. I cover that in the next article.

    A quick self-assessment

    Answer yes or no:

    • We can report total contingent spend by supplier within a day.
    • Our rates for the same role are consistent across departments.
    • Every supplier has a current agreement with standard terms.
    • One named person owns the program.
    • We review supplier performance on a regular schedule.
    • Hiring managers know the rules for engaging contingent workers.

    Four or more “no” answers mean a program would likely pay for itself. Two or three means targeted fixes may be enough. Zero or one means you are in better shape than most.

    What to do next

    You do not need to make big decisions yet. The best first step is to find out where you actually stand: your total spend, your suppliers, your rates and your contracts. I will walk through that baseline in Article 3. Before that, Article 2 covers how to choose a model that fits a company your size.

    If you would like help figuring out where you stand, I am happy to talk it through. Email me at becky@ennisbader.com to schedule a 20 minute discussion.

  • Before You Buy a VMS, Settle These Five Things

    Before You Buy a VMS, Settle These Five Things

    Photo by Imkara Visual on Unsplash

    Technology will not fix a program you have not defined yet.

    A Vendor Management System (VMS) can bring real structure to contingent labor: requisitions, approvals, rates, reporting. But software enforces the rules you give it. If the rules are unclear, the system makes the confusion faster and more expensive.

    In 30 years of implementing and managing these programs, the ones that struggle almost always skipped the same groundwork. Settle these five things before you sign anything.

    1. Governance: who decides?

    Who owns the program? Who approves exceptions? Who resolves a dispute between a hiring manager and a supplier? If the answer is “it depends,” the system will inherit that problem.

    2. Stakeholders: who needs to be in the room?

    Procurement, HR, finance, legal, IT, and the hiring managers who will use the system every day all have a stake. Programs that leave one of them out usually hear from them after launch.

    3. Data: can you trust what you have today?

    A VMS reports on the data it is given. If worker records, cost centers, and rates are inconsistent today, the first reports will be disappointing. Know your starting point and clean it up where you can before the move.

    4. Supplier strategy: who will you work with, and how?

    Decide how many suppliers you want, how they are tiered, and how you will measure them. Moving to a managed program changes the relationship with your suppliers. Tell them early and plan for it.

    5. Success metrics: how will you know it worked?

    Pick a short list of measures before launch, such as spend under management, time to fill, supplier performance, and conversion rate. If you cannot describe success in advance, you cannot judge the program or the provider afterward.

    A quick self-check

    • ☐ We can name the single owner of our contingent program.
    • ☐ Every stakeholder group has been consulted.
    • ☐ We know where our current contingent data lives and how reliable it is.
    • ☐ We have a supplier strategy, not just a supplier list.
    • ☐ We have written down what success looks like.

    If you cannot check every box, that is the work to do first. It is also where an outside perspective helps most.

    If you are evaluating an MSP, MVP, or VMS and would like a second set of eyes before you commit, message me or reach out through this site.

  • MSP, MVP, and VMS: What They Are and How They Differ

    These three acronyms get used interchangeably. They shouldn’t be.

    I hear “we need an MSP” when someone means software, and “we need a VMS” when someone means a partner to run the program. Mixing them up leads to the wrong conversations with the wrong vendors. Here is a plain-language comparison.

     VMSMSPMVP
    Stands forVendor Management SystemManaged Service ProviderMaster Vendor Program
    What it isSoftwareA service partnerA single lead supplier
    What it doesHandles requisitions, approvals, rates, timekeeping, and reporting in one platformRuns the program day to day: supplier management, requisition handling, reporting, compliance supportManages the supplier relationship and fills orders first, typically aiming to fill at least 80% itself, then passes the rest to other suppliers
    Who runs the workYour team, using the toolThe provider’s team, on your behalfThe master vendor, as part of a staffing relationship
    Best fit whenYou have a defined program and need structure and dataYou want the program managed with less internal effortYou want a simpler structure with one accountable supplier

    Provider models vary, so the details of any real agreement matter more than the label. Treat the table as a starting point for your questions.

    How they fit together

    They are not always alternatives. A VMS is a tool. An MSP or MVP is a way of running the program, and either can use a VMS. Some MSPs bring their own technology. Others work inside the one you already own.

    Questions to ask any provider

    1. Who owns the data, and can I take it with me if we part ways?
    2. Does the provider also supply workers, and how are conflicts of interest handled?
    3. How are suppliers selected, tiered, and measured?
    4. What does the fee cover, and what does it not?
    5. What will I be able to see, and how often?

    Choosing between them

    Start with the problem, not the product. If you lack visibility, you may need data and a system. If you lack capacity to manage the program, you may need a service partner. If you want a lighter structure, a master vendor model may fit. The right answer depends on your size, your suppliers, and how much you want to run yourself.

    If you are weighing these options and want an independent view, message me or reach out through this site.

  • The Invoice Is the Tip of the Iceberg

    Most companies can tell you exactly what they paid their contingent workers last month, because the invoices say so. What the invoices don’t tell you is far more important.

    After 30 years in the staffing industry, I see the same pattern in company after company. Full-time payroll is tracked to the penny. Contingent spend is tracked to the invoice. Those are not the same level of visibility, and the gap between them is where money and risk hide.

    What the invoice shows you

    The invoice shows what you were billed. It does not show whether that was the right amount, for the right people, doing the right work, under the right terms.

    What sits below the waterline

    • Rate creep. Bill rates drift upward over the life of an assignment, and over multiple assignments, without anyone deciding they should. Without a rate card and someone watching it, increases go unquestioned.
    • Off-contract usage. Hiring managers bring in workers through suppliers or arrangements that were never part of your program. The spend is real, but it is invisible to the people responsible for managing it.
    • Missed conversions. Strong contingent workers who would make excellent employees stay contingent because nobody is tracking tenure, performance, or conversion terms.
    • Compliance risk. Worker classification, assignment length, and co-employment questions are easy to overlook when no one has a complete picture of who is on assignment and why. (Questions like these belong with your legal counsel.)

    Five questions to test your visibility

    1. How much are we spending on contingent labor across the whole company?
    2. Who is on assignment right now, and for how long?
    3. What are we paying per hour, and why?
    4. How many contingent workers have we converted to employees in the past year?
    5. Do our managers understand how managing contingent workers differs from managing employees?

    If you hesitated on any of them, you are in good company. Most organizations do. It is also fixable.

    Where to start

    Visibility does not require a new system on day one. It starts with defining what counts as contingent labor in your company, finding every place that spend lives, and agreeing on the handful of measures that matter. Technology comes after that, not before.

    If you would like help finding where your biggest gaps are, I offer a 20-minute conversation to walk through them. Message me or reach out through this site.

    Leave a Reply

    Your email address will not be published. Required fields are marked *

  • Why MSP Programs Don’t Fail, They Drift

    |

    Year one of a new MSP program feels great.

    The savings come in. Rates are standardized. For the first time, someone can tell the CFO how many contingent workers are on site and what they cost. The QBR deck is full of green arrows, and everyone who fought for the program feels proven right.

    Then year three arrives.

    Fill rates are slipping, but slowly enough that nobody raises an alarm. The same two suppliers get almost every order. Hiring managers have found ways around the VMS. The QBR deck looks exactly like it did last year, and the meeting gets shorter every quarter.

    Nobody can point to the day the program broke, because it didn’t break. It drifted.

    I’ve spent 20 years building and running managed service programs, from $10M to $150M in spend, and led an MSP division to $220M under management. In that time, I’ve seen very few programs fail outright. I’ve seen a lot of them drift. Drift is harder to spot, and it can cost just as much.

    One client stays with me. We came in as the second-generation MSP, taking over from the original provider, and the headcount was half of what we expected. We soon found out why. Several sites had been going around the program entirely, and those suppliers were sending invoices straight to Accounts Payable. When we dug in, the off-program suppliers were charging 20–30% more than the suppliers inside the program.

    On paper, the program looked fine. It just couldn’t see a large share of the workforce it was supposed to manage.

    What drift looks like

    Drift is hard to spot because each sign looks small on its own. Taken together, they tell you the program is running on autopilot:

    • Fill rates and time-to-submit are slipping a little each quarter. No single month is bad enough to escalate.
    • Order distribution has concentrated. Two or three suppliers get most of the work while the rest stop competing, so you’re paying for competition you no longer have.
    • Rogue spend is creeping back. Managers go straight to an agency they like or bring on “consultants” outside the program.
    • Sites that always used contingent workers suddenly have no orders. The work rarely just disappears. More often, those sites are filling outside the program.
    • The VMS reflects how you worked three years ago. Approval chains still route to people who left. Job titles and rate cards haven’t been updated.
    • QBRs have turned into status updates. The same slides every quarter, no decisions and no actions with owners.
    • Savings are reported against a baseline from launch. Nobody has asked what the program should be delivering now.

    Why programs drift

    In my experience, drift almost always traces back to four causes.

    1. Nobody on the client side owns the program anymore. The executive sponsor who championed the MSP moves on. The program manager who knew every detail gets promoted or leaves. Without an owner, the program gets managed, but nobody is steering it.

    2. Scorecards exist, but nobody acts on them. Most programs measure supplier performance. Far fewer actually do something with the results. When a low performer keeps getting orders and a top performer isn’t rewarded, suppliers learn the scorecard doesn’t matter.

    3. The technology froze at go-live. The VMS was configured for the business as it was at launch. The business has changed since then: new sites, new roles, new approvers. The system hasn’t kept up, so people work around it, and every workaround is spend the program can’t see.

    4. Success was defined once and never redefined. Year-one goals are usually about consolidation and rate savings. Once you hit them, the program needs new goals: quality, conversion, tenure risk, total cost. Without them, the team keeps defending results it already delivered.

    Who pays for it

    Drift costs both sides of the program.

    The client pays in money and risk it can’t see. Rates creep up through exceptions. Long-tenured workers build up without anyone reviewing them. Spend leaks outside the program. Then a new procurement leader asks why they’re paying an MSP fee, and nobody has a good answer.

    The staffing firm or MSP provider pays at renewal. A program that has drifted is easy to rebid. The relationship looks fine on the surface, then the RFP lands and the provider finds out the client has been quietly unhappy for a year. If you’re a staffing firm running an MVP, this risk is even sharper. You won the account by promising to manage it, so drift reads as a broken promise.

    The frustrating part is that drift is almost always fixable, and usually without starting over.

    How to catch it

    You don’t need a new MSP or a new VMS to fix drift. You need to look at the program with fresh eyes, then put a rhythm in place that keeps it from happening again.

    Start with a program health check. Review four areas:

    1. Contract and goals. Does the statement of work still match what the business needs? Are the KPIs the right ones for this stage of the program?
    2. Supplier performance. Pull 12 months of order distribution, fill rate, time-to-submit and quality data. Who’s actually delivering, and who’s getting orders anyway?
    3. VMS configuration. Check approval chains, job catalogs, rate cards and site setups against how the business runs today. Find where people are working around the system, and why.
    4. Governance. Who owns the program by name? What decisions came out of the last three QBRs? Were any of them acted on?

    Then put a governance cadence in place:

    • Monthly: an operational review between the program team and the client owner. Look at metrics and exceptions and assign actions with owners.
    • Quarterly: a business review focused on decisions, not status. Cover supplier tiering, rate changes and new goals.
    • Annually: a program reset. Revisit the goals, the supplier base and the technology setup as if you were launching again.

    Finally, close the back doors. Governance meetings catch drift. Controls stop it. That means partnering with two teams that program owners often overlook:

    • Accounts Payable: No invoice for staffing or contract labor gets paid unless it comes through the program or has Procurement’s approval. AP should also flag any new vendor billing for labor.
    • Contracts: Every new staffing, consulting or statement-of-work agreement goes through the program team before it’s signed. Supplier agreements should require suppliers to work through the program.
    • A quarterly spend sweep: AP pulls all payments to labor vendors made outside the program, and the program team reviews them. Whatever turns up is either brought into the program or approved as an exception, on purpose.

    None of this is complicated. It just has to be someone’s job.

    Remember the second-generation program from the start of this article? Fixing it took partnership more than technology. We worked with the client’s Procurement and HR teams, and the client changed one key process: Accounts Payable could no longer pay a staffing vendor without Procurement’s approval. Within 18 months, every remaining supplier was inside the program.

    Everyone came out ahead. The suppliers in the program gained market share. The client saved hundreds of thousands of dollars through rate adjustments and volume rebates. None of that money had been visible until someone went looking.

    The bottom line

    Your MSP program probably isn’t failing. But if your QBRs feel routine, your supplier mix hasn’t changed in a year, and nobody can say what success should look like this year, it’s drifting.

    The programs that last aren’t the ones with the best launch. They’re the ones someone keeps steering.

    Which of these warning signs have you seen in a program you’ve run or worked with? I’d love to hear in the comments.

    Becky Ennis-Bader is the founder of Ennis-Bader Workforce Strategies, which helps staffing firms and companies design, launch and govern contingent workforce programs. Services include MSP/MVP Program Design & Launch, VMS Selection & Implementation Support, and Program Governance & Operations. Learn more at ennisbader.com or follow the company page for more on building programs that last.